Gift or Settlement : Difference between the Gift and the Settlement is the existence of consideration in the settlement

Civil appeal concerning the nature of a property document executed in 1985 by a father in favour of his daughter. The core issue is whether the document is a gift deed, a settlement, or a will, as this classification determines its revocability and the validity of subsequent transactions. The court examines the definitions and legal characteristics of gifts, settlements, and wills under Indian law, noting their distinctions regarding consideration, present transfer of interest, and revocability. Ultimately, the judgment affirms the High Court’s decision that the document is a gift by settlement, concluding that it effected an immediate transfer of interest to the daughter despite the father retaining a life interest, and therefore, its unilateral cancellation was invalid.

(A) Transfer of Property Act, 1882, Section 11, 122, 126 to 128 – Indian Succession Act, 1925, Section 2(h), 59, 61 to 63, 70, 89 -Indian Stamp Act, 1899, Section 2(q); Article 33 – Kerala Stamp Act, 1959, Section 2(q); Article 31 – Registration Act, 1908, Section 17 – Specific Relief Act, 1963, Section 2(b) – Gift – Settlement – Whether the document of the year 1985 is a gift or Settlement or Will? and whether the requirements under law or conditions in the deed have been satisfied to vest a legal right? – Held that there is consideration, conveyance, imposition of conditions and reservation of life interest by the executant, Defendant No. 1/father satisfying the requirements to classify the document as a “settlement” – The conditions to construct a house, to reside in the house, retention of life interest, the right of mortgage up to a sum of Rs.2,000/- and avail loan on that basis, cannot alter the gift, by which in unequivocal terms, the property stood vested in the plaintiff by earlier part – The condition, creating a life interest in favour of father and mother and the restriction regarding mortgage, would further imply that Defendant No. 1 had ceased to be the absolute owner – The postponement of delivery by creation of life interest is not an anathema to absolute conveyance in praesenti – Defendant No.1 has not only expressed that the property is being conveyed on account of love and affection, by vesting the rights in the property in praesenti in favour of the plaintiff, but also enabled the plaintiff to construct the house from then on and no outer time has been fixed for the construction of the house – Since the life interest was reserved in favour of Defendant No.1 and his wife, Defendant No.1 was only holding an ostensible possession and ownership as contemplated under Section 41, while the true owner being the plaintiff, after the clear conveyance by earlier clause – Held that  the instrument of 1985 is a gift by settlement – Delivery of possession is not sine qua non to validate a gift or settlement – Not in dispute that the plaintiff has registered the instrument – Such registration by the plaintiff is possible only if the document was handed over by Defendant No.1 – The factum of acceptance can be derived from the conduct of the parties – Once the document is declared as “gift”, Defendant No. 1 had no right to cancel the same unilaterally and the Sub Registrar had no right to register the cancellation deed – Once the document is categorized as a gift, in the absence of any clause or reservation to cancel, the executant has no right to cancel the same – The reasons for cancellation or revocation of gift have to be proved in a court of law – Therefore, according to us, the unilateral cancellation of the document is void and as a natural corollary, the sale deed dated 19.10.1993 executed by Defendant No. 1 / father also, is invalid – Trial Court as well as the First Appellate Court had erroneously come to the conclusion that Ext.A1 document was a Will, without appreciating the law – High Court rightly set aside the concurrent judgments of the Courts below by treating the document as settlement in the judgment impugned herein.

(Para 15.1, 16, 18 to 20)

(B) Transfer of Property Act, 1882, Section 122 – Transfer of Property – Interplay between Gift and Settlement – Held that primary difference between the Gift and the Settlement is the existence of consideration in the settlement – Consideration is nothing but the quid pro quo, that each party to a contract is to perform or render a part of their obligation under the contract – In view of the fact that a gift is a voluntary disposition, it is essentially not an agreement and hence, the element of consideration is taken away from it – Settlement on the other hand is always coupled with consideration as it is mostly executed in favour of a family member – The gift or settlement of an immovable property has to be registered as per Section 17 of the Registration Act – The conditions regarding acceptance, reservation of life interest and restriction on revocation are applicable to both “gift and settlement” – The vesting of the right also takes place in praesenti in both the cases – Therefore, there is an element of gift in every settlement.

(Para 11.3)

(C) Transfer of Property – Interplay between Gift and Will – Held that a will is the declaration of the intention of the testator to give away his property – Such Will comes into force after the death of the testator. The most important requirement for a valid will is that it must again be a voluntary disposition in sound mind, which must be explicit from the instrument itself. Therefore, it can be concluded that every will also has an element of gift, with the difference being the disposition deferred until the death of the testator. Insofar as the revocation is concerned, the testator is at liberty to revoke or alter the will any number of times until his demise, but it is essential that he remains of sound mind while doing so.

(Para 11.4)

(D) Transfer of Property – Interplay between Gift, Settlement and Will – Held that the element of voluntary disposition is common to all the three deeds. – The element of gift is traceable to both “settlement” and “will” – As settled in law, the nomenclature of an instrument is immaterial and the nature of the document is to be derived from its contents – While so, a voluntary disposition can transfer the interest in praesenti and in future, in the same document – In such a case, the document would have the elements of both the settlement and will – Such document, then has to be registered and by operation of the doctrine of severability, becomes a composite document and has to be treated as both, a settlement and will and the respective rights will flow with regard to each disposition from the same document – Reservation of life interest or any condition in the instrument, even if it postpones the physical delivery of possession to the donee/settlee, cannot be treated as a will, as the property had already been vested with the donee/settlee.

(Para 11.5)

(E) Transfer of Property – Interplay between Gift, Settlement and Will – There must be a transfer of interest in praesenti for a gift or a settlement and in case of postponement of such transfer until the death of the testator, the document is to be treated as a will – The fact that a document is registered, cannot be the sole ground to discard the contents and to treat the document as a gift, just because the law does not require a will to be registered – The act and effect of registration depends upon the nature of the document, which is to be ascertained from a wholesome reading of the recitals – The nomenclature given to the document is irrelevant – The contents of the document have to be read as a whole and understood, while keeping in mind the object and intent of the testator – In case of a gift, it is a gratuitous grant by the owner to another person; in case of a settlement, the consideration is the mutual love, care, affection and satisfaction, independent and resulting out of the preceding factors; in case of a will, it is declaration of the intention of the testator in disposition of his property in a particular manner – Therefore, even when there is any ambiguity in understanding the nature of the documents from its contents the subsequent conduct of the executant must also be considered to take a decision – It is possible that in a single document, there could be multiple directions in different clauses though seemingly repugnant but in reality, it could only be ancillary or a qualification of the earlier clause – Therefore, the document must be harmoniously read to not only understand the true intent and purport, but also to give effect to each and every word and direction.

(Para 14.1)

N.P. Saseendran V. N.P. Ponnamma & Ors.

Supreme Court: 2025 INSC 388: (DoJ 24-03-2025)

2025 INSC 388 Click here to View Full Text of Judgment

2025 INSC 388 Download Supreme Court File

Next Story
Next Story

Delayed Death: When ‘Attempted Murder’ Becomes More

Maniklall Sahu, the appellant, along with three co-accused, trespassed into the house of Rekhchand Verma, assaulted him with sticks and fisticuffs, and flung him from a terrace. The injured person, Rekhchand Verma, initially survived but was in a critical condition. He eventually succumbed to his injuries approximately nine months after the incident, dying on 8th November 2022 due to septicaemia and pneumonia, leading to cardiorespiratory arrest. The trial court had initially convicted the appellant under Section 302 of the Indian Penal Code (IPC) for murder. However, the High Court altered this conviction to Section 307 IPC for attempt to murder, sentencing the appellant to 7 years of rigorous imprisonment and a fine of Rs. 1,000/-. The appellant subsequently filed this appeal challenging the Section 307 IPC conviction.

Law Involved The primary legal provisions under consideration are Sections 299, 300, 302, and 307 of the Indian Penal Code (IPC).

Section 307 IPC (Attempt to Murder): This section deals with acts done with the intention or knowledge that it might cause death, and if death occurs, the act would be murder.

Section 299 IPC (Culpable Homicide): Defines culpable homicide.

Section 300 IPC (Murder): Specifies when culpable homicide amounts to murder, including acts done with the intention of causing death, or causing bodily injury sufficient in the ordinary course of nature to cause death, or knowing the act is so imminently dangerous that it will most probably cause death.

Section 302 IPC (Punishment for Murder): Prescribes the punishment for murder. The core legal question revolves around the “Application of Theory of Causation where death ensues after some delay” and whether the High Court correctly applied Section 307 IPC despite the victim’s eventual death.

Reasoning The Supreme Court critically analysed the High Court’s decision to alter the conviction from Section 302 IPC to Section 307 IPC, especially given the victim’s death.

  1. Medical Evidence and Causation: The Court reviewed extensive medical evidence, which consistently showed that the deceased, Rekhchand Verma, suffered severe injuries, including a head injury, spinal cord injury leading to paraplegia, and multiple complications such as infected bedsores, septic shock, and bilateral pneumonia. Medical experts testified that these complications were a direct result of the initial injuries sustained during the assault and were sufficient in the ordinary course of nature to cause death. The Court highlighted that the injured person received medical treatment for nine months before his demise. The Court concluded that the injuries suffered were grievous and that the death was a consequence of these injuries, with complications like septicaemia and pneumonia not breaking the chain of causation.
  2. High Court’s Error: The Supreme Court determined that the High Court committed a serious error in bringing the case under the ambit of “attempt to commit murder” (Section 307 IPC) on the premise that the victim survived for about nine months, and his death was due to complications during treatment and not directly from the initial injuries. The Supreme Court stressed that if the injury was fatal and intended to cause death, or if death occurred after some delay due to septicaemia or other complications stemming from the injury, the offence would fall under the first limb of Section 300 IPC (murder) [36a]. Furthermore, if the injuries were sufficient in the ordinary course of nature to cause death and death occurred due to septicaemia or other complications, the act would amount to culpable homicide punishable under Section 302 IPC, falling under the third limb of Section 300 IPC [36b, 37c, 37d].
  3. Jurisprudence on Delayed Death: Drawing on various precedents, the Court reiterated that delayed death or intervening medical conditions (like septicaemia or pneumonia) do not automatically absolve an accused of murder charges if the initial injuries were the proximate cause of death. The Court concluded that the cause of death was indeed due to the injuries suffered, and the contention that the death resulted from a lack of proper treatment or was disconnected from the initial assault was unfounded.

Holding The Supreme Court dismissed Maniklall Sahu’s appeal . While the appellant’s conviction under Section 307 IPC (attempt to murder) as altered by the High Court stands affirmed due to the dismissal of his appeal, the Supreme Court clearly stated that the High Court committed a serious error in altering the conviction from Section 302 IPC to Section 307 IPC . The Supreme Court’s detailed reasoning underscored that given the medical evidence and the established chain of causation, the offence should have been considered murder or culpable homicide amounting to murder, punishable under Section 302 IPC, because the injuries were sufficient in the ordinary course of nature to cause death.

Maniklall Sahu Vs State of Chhattisgarh

Supreme Court: 2025 INSC 1107: (DoJ 12-09-2025)

2025 INSC 1107 Download Supreme Court File

Next Story

Tender Troubles: Supreme Court Upholds Bid Sanctity, Overturns Rectification

The case originated from an electronic bid (No. 7 of 2023-24) issued by the Superintending Engineer and Project Director, Project Implementation Unit – I, Public Works (Roads) Directorate, Government of West Bengal, on 17.10.2023. The tender was for collecting Road User Fee (RUF) from commercial vehicles for 1095 days. The earnest money deposit was fixed at Rs. 25,00,000.00. Seven bidders participated. The technical bids were evaluated, and four bidders were technically qualified, including Prakash Asphaltings and Toll Highways (India) Limited (appellant) and Mandeepa Enterprises (respondent No. 1).

Financial bids were opened on 08.12.2023. The appellant, Prakash Asphaltings, was found to be the highest bidder (H1) with a quoted amount of Rs. 91,19,00,000.00 for 1095 days. Respondent No. 1, Mandeepa Enterprises, was the lowest bidder (H4) with an offered amount of Rs. 9,72,999.00 per day.

Respondent No. 1 subsequently claimed a typographical error in their financial bid, stating they intended to quote Rs. 106,54,33,905.00 for the entire contract period instead of Rs. 9,72,999.00 per day. They requested the tendering authority to treat the figure of Rs. 9,72,999.00 as a typographical error and read it as Rs. 106,54,33,905.00. The tendering authority rejected this request on 20.12.2023, stating that correction of a financial bid after opening was not possible and would impeach the sanctity of the tender process.

Aggrieved, Respondent No. 1 filed a writ petition (WPA No. 29001 of 2023) before a Single Judge of the High Court, which was dismissed on 03.01.2024, as the Single Judge found no scope for interference. Respondent No. 1 then filed an intra-court appeal (MAT No. 93 of 2024). A Division Bench of the High Court allowed the appeal on 23.02.2024, observing that the error in quoting the figure by respondent No. 1 was inadvertent. The Division Bench directed the tendering authority to evaluate Respondent No. 1’s BOQ at Rs. 106,54,33,905.00 and offer other bidders the opportunity to match this figure. This civil appeal was directed against the Division Bench’s judgment and order.

Law Involved

Clause 4(g) of the Notice Inviting Electronic Bid: This clause specifically states that any change in the template of the Bill of Quantity (BOQ) will not be accepted under any circumstances.

Clause 5B(v) of the Instructions to Bidders: This clause outlines that during bid evaluation, if bidders fail to submit supporting documents or original hard copies within the stipulated timeframe, their proposals will be liable for rejection.

Article 226 of the Constitution of India: Pertains to the High Court’s jurisdiction to issue writs.

Principles of Equity and Natural Justice in Tender Processes: The judgment refers to the importance of these principles in tender and contract awards, but also emphasises that these principles should be kept at a distance when there is a violation of rules.

Judicial Review of Administrative Action: The Court reiterated that judicial review in administrative action, particularly tenders, is limited to preventing arbitrariness, irrationality, bias, and mala fides. Courts should not interfere with a decision unless it is “unlawful” or “unsound”.

Public Interest: Tenders are a cornerstone of governmental procurement processes, aiming for competitiveness, fairness, and transparency in resource allocation. Adherence to rules and conditions and the sanctity of the tender process are paramount.

Reasoning The Supreme Court reasoned that the Division Bench’s interpretation was erroneous for several key reasons:

Sanctity of Tender Process: The Court held that allowing rectification of financial bids after they have been opened would impeach the sanctity and integrity of the entire tender process.

Strict Adherence to Tender Conditions: Clause 4(g) explicitly prohibits any change in the BOQ template under any circumstances. The Division Bench’s broad interpretation of “bona fide mistake” to allow rectification was held to be incorrect and would put “shackles on the functioning of the tendering authority”.

Nature of the Mistake: While Respondent No. 1 claimed an inadvertent mistake, it was effectively a unilateral or systematic computer typographical transmission failure, not one attributable to the tendering authority. Such a mistake, even if unintentional, cannot be a ground to allow post-bid modifications that would undermine the competitive bidding process.

Adverse Consequences to Public Exchequer: The Division Bench’s decision to re-evaluate Respondent No. 1’s bid at a significantly higher amount (Rs. 106,54,33,905.00) meant that the appellant, who was originally the H1 bidder, would be displaced. This would lead to a considerable loss of revenue to the state exchequer (approximately 15 crores) by not accepting the higher bid of the appellant and giving an opportunity to Respondent No. 1 to correct its bid post-opening.

Limited Scope of Judicial Review: The Court reiterated that interference by a writ court in ongoing tender processes is not permissible unless there is a clear violation of principles of natural justice, or the decision is arbitrary or mala fide. The Division Bench’s decision was deemed a clear violation of natural justice principles.

Non-Joinder of Party: The appellant (Prakash Asphaltings), as the highest bidder and a directly affected party, was not made a party respondent in the intra-court appeal before the Division Bench, which was viewed as prejudicial and a violation of natural justice.

Holding The Supreme Court allowed the civil appeal, thereby setting aside and quashing the judgment and order dated 23.02.2024 passed by the Division Bench of the High Court at Calcutta in MAT No. 93 of 2024. The Court sustained the order of the learned Single Judge dismissing the writ petition. Consequently, Prakash Asphaltings and Toll Highways (India) Limited (the appellant), being the H1 bidder, is to be awarded the contract in terms of the notice inviting electronic bid dated 17.10.2023. The Court also ruled that there shall be no order as to costs.

Prakash Asphaltings And Toll Highways (India) Limited Vs Mandeep Enterprises And Others

Supreme Court: 2025 INSC 1108: (DoJ 12-09-2025)

2025 INSC 1108 Download Supreme Court File

Next Story

“Speculative Investors” Barred from IBC Relief: Supreme Court Upholds Homebuyer Protections

Four appeals were heard together, arising from orders of the National Company Law Appellate Tribunal (NCLAT). The key appellants, Mansi Brar Fernandes and Sunita Agarwal, had entered into agreements with developers (Gayatri Infra Planner Pvt. Ltd. and Antriksh Infratech Pvt. Ltd., respectively) for property units. Both agreements included buy-back clauses and involved advance payments. The developers defaulted, and the appellants initiated proceedings under Section 7 of the Insolvency and Bankruptcy Code (IBC). The NCLAT reversed the admission of these applications, branding the appellants as “speculative investors” rather than genuine homebuyers or financial creditors.

Law Involved: The central legal framework is the Insolvency and Bankruptcy Code, 2016 (IBC), specifically Section 7, which governs the initiation of the Corporate Insolvency Resolution Process (CIRP) by financial creditors. The Insolvency and Bankruptcy Code (Amendment) Ordinance, 2019, and the subsequent Amendment Act, are also critical. These amendments introduced a threshold requirement for allottees to file a Section 7 application (requiring at least 10% of allottees or 100 allottees). The Court frequently referenced its earlier judgment in Pioneer Urban Land and Infrastructure Ltd v. Union of India, which distinguishes between genuine homebuyers and speculative investors. The judgment also emphasizes the Right to Shelter as a fundamental right under Article 21 of the Constitution and the role of the Real Estate (Regulation and Development) Act, 2016 (RERA).

Reasoning: The Supreme Court deliberated on the distinction between “speculative investors” and “genuine homebuyers” within the context of the IBC. It observed that the IBC is intended as a collective mechanism to revive viable projects and safeguard the fundamental right to shelter of genuine homebuyers, not as a recovery tool or a bargaining chip for individuals. The legislative intent behind recognizing allottees as financial creditors was to protect genuine homebuyers, while simultaneously preventing misuse by speculative investors seeking premature exits or exorbitant returns, which had burdened the real estate sector and the adjudicatory machinery.

The Court provided criteria to identify speculative investors, including: agreements that substitute possession with buy-back or refund options, insistence on refunds with high interest, purchase of multiple units (especially in double digits), demanding special rights or privileges, deviations from the RERA Model Agreement, and unrealistic interest rates or promises of returns. The transaction entered into by Mansi Brar Fernandes, involving a buy-back clause and the pursuit of commercial returns rather than possession, led the Court to conclude that she was indeed a speculative investor. Similarly, Sunita Agarwal’s agreement for an “investment” with a 25% per annum return over 24 months, coupled with a buy-back clause, indicated a speculative intent.

While affirming the NCLAT’s finding that the appellants were “speculative investors,” the Supreme Court clarified that the Insolvency and Bankruptcy Code (Amendment) Ordinance, 2019, was indeed applicable to the facts of the present case, correcting the NCLAT’s reasoning on this point [19, 20, 35, 36, 48(ii)]. The Court applied the doctrine of Actus Curiae Neminem Gravabit (an act of the Court shall prejudice no one) to address the procedural issues related to the Ordinance’s applicability and the delay it caused.

Holding: The Supreme Court affirmed the NCLAT’s findings that Mansi Brar Fernandes and Sunita Agarwal were “speculative investors” and therefore not entitled to initiate proceedings under Section 7 of the IBC [25, 34, 48(i)]. Consequently, the Court upheld the NCLAT’s orders setting aside the admission of their Section 7 applications by the NCLT [48(i)]. However, the Court clarified that the Ordinance/Amendment Act was applicable to the case, although this correction in reasoning did not alter the ultimate outcome given the appellants’ status as speculative investors [48(ii)]. The appellants remain free to pursue their remedies through other appropriate legal forums, without being barred by limitation [48(i)].

Mansi Brar Fernandes Vs Subha Sharma And Anr.

Supreme Court: 2025 INSC 1110: (DoJ 12-09-2025)

2025 INSC 1110 Download Supreme Court File